Filter
ID Agenda Action Type Responsible Start Date Due Date Latest Updates Next Steps Status Owner Date Created Date updated
00afe4db-bed2-4580-a847-8833cde505d7 CBHI 1. Engaging banks and insurance companies. 2. A comprehensive model for capitation grants. Stocktake MoH 01-07-2023 Banks agree to 2% profit contribution. Insurance companies await Accident Compensation Law approval. Capitation grant model for RSSB finalized Dec 2024, implemented Jan 2025. N/A On-track 22-01-2025 09:38 PM 22-04-2025 01:50 PM
01be9250-3e31-45f4-b7f0-25cfabf3317a ELECTRICITY TARIFFSs:FOR NON (or) RESIDENTIAL Removing loans and streetlights bills Stocktake MININFRA 01-07-2025 MININFRA and MINECOFIN have engaged the World Bank on electricity tariff modeling. N/A Needs Urgent Action 22-01-2025 09:38 PM 22-04-2025 03:49 PM
0421decf-ad56-4fef-be8c-79997c3019c1 TEACHER MANAGEMENT SYSTEM MINEDUC to establish a robust system for managing teacher transfers, ensuring that placements are aligned with transfer requests and available vacancies. Stocktake MINEDUC 01-09-2024 The Teacher Management Information System (TMIS) was developed and is operational N/A On-track 22-01-2025 09:37 PM 22-04-2025 11:23 AM
08053381-0e48-4e90-840f-0254cbe06140 CHIA SEED Finalize payments owned to farmers and communicate the plan to settle arrears Stocktake MINAGRI 03-04-2023 Frw 1, 498,467, 686 has been paid to 1675 cases. file was closed Completed 22-01-2025 09:38 PM 22-04-2025 01:51 PM
0cc8d63a-7d08-403e-8813-e3976a4aa86c CELL RESTRUCTING Review district organizational structures and tailor them to their specific needs/contexts Stocktake MINALOC 01-05-2024 A revised district structure is pending cabinet approval. N/A On-track 22-01-2025 09:37 PM 22-04-2025 01:51 PM
0e0266ee-383b-4799-944d-b20cc69f910b HEALTH SECTOR REFORMS 1) Status on the acquisition of medical equipment from the manufacturer. 2) Joint team responsible for monitoring. 3) Clear master plan for Kigali Health City 4) Attracting medical professionals from abroad. 5) Retention and motivation for health workers. Stocktake MoH 01-08-2023 All batch 2 are installed, however 11.7 million euros payment is pending. 2)a detailed master plan is under development & communication plan to inform landowners & investors. Reforms aimed at improving health worker retention On-track 22-01-2025 09:38 PM 22-04-2025 01:52 PM
110034fc-c51f-4ee2-83c2-aefe421e5f95 HEALTH SECTOR REFORMS Resource fund for implementation Stocktake MoH 01-08-2023 No fund was created. However, MoH found partners for various initiatives. N/A On-track 22-01-2025 09:37 PM 22-04-2025 01:52 PM
115ddf71-7791-4ab7-9286-1af857ca9edc BRIEFING MEETING ON NST2 Integrate the comments from ministries and publish the final document so that it is available to the public. Stocktake MINECOFIN 01-08-2024 NST 2 final document is now available on MINECOFIN website N/A On-track 22-01-2025 09:37 PM 22-04-2025 01:52 PM
11b7398b-b396-42be-b5ff-083b02f7a905 GASMETH Signing a purchase agreement to access finance Stocktake MININFRA 01-12-2023 The Gas Purchase Agreement (GPA) has been signed N/A Completed 22-01-2025 09:37 PM 22-04-2025 01:53 PM
12ed53c8-ff92-4d6b-a540-4e0fc8c57d0d SETTLEMENT REGULATIONS COMPLIANCE Relocate all the people who live near the Sebeya River Post-cabinet MINEMA 01-05-2023 All people to lived near Sebeya were relocated N/A On-track 22-01-2025 09:38 PM 22-04-2025 03:49 PM
14264180-3e72-4736-87ac-e7c6a294276d SMALL SCALE ARTIAN MINING Shift small-scale artisanal mining to top foreign exchange earner Post-cabinet RMB 05-01-2023 Ongoing exploration will attract investment, facilitated by partnerships between foreign and local entities such as Rio Tinto N/A On-track 22-01-2025 09:38 PM 22-04-2025 03:54 PM
16ce630f-907c-4523-bb32-f2d88816b551 FISCAL GAP To secure FRW 150 billion for payment of counterpart funds (expropriation and taxes) to unlock the e Stocktake MINECOFIN 01-05-2023 A total of Frw 43.9 billion was allocated for Counterpart funds in FY 2024/2025 to unlock the execution of externally funded projects. Frw 106.1 billion remains. N/A On-track 22-01-2025 09:38 PM 22-04-2025 01:56 PM
18c661ca-b6f3-4a9a-a179-2ed5e6985bd3 ECONOMIC BRIEFING Discuss economic forecast fiscal policy forex reserves and update on key projects in terms of financing Stocktake MINECOFIN 01-04-2024 Due to slow progress, the government is considering canceling stalled projects, particularly 4 Exim India Portfolio projects worth $400 million, including renewable energy and infrastructure projects. N/A Delayed 22-01-2025 09:37 PM 22-04-2025 01:56 PM
1abc7cff-6e87-4d90-b3e7-09772eaec597 QUALITY OF EDUCATION Textbook printing from Rwanda Stocktake MINEDUC 03-07-2023 Printing was done N/A Completed 22-01-2025 09:38 PM 22-04-2025 01:56 PM
1c761d2b-e185-4a85-845f-c322a3ff2f6d FOOD SECURITY & INFLATION Upgrade silos in poor conditions for grain storage. Stocktake MINAGRI 04-12-2023 New 10,000 MT silo under construction in Kigali Economic Zone. Nyagatare silos upgraded & expanded to 20,000 MT. Nyanza warehouse expanded to 4,500 MT with security enhancements. N/A On-track 22-01-2025 09:37 PM 22-04-2025 01:57 PM
1f2d5892-3a8d-406a-9b04-2e048229012a TELECOM INFRASTRUCTURE Developing a fund model to support construction Stocktake MINICT 03-07-2023 Two models namely Capital expenditure(Capex) and Operational expenditure (Opex) were explored. Opex was judged the most suitable due to its low costs ($127,626,000) N/A On-track 22-01-2025 09:38 PM 22-04-2025 01:57 PM
20ca6689-8ec5-4cc3-990c-b8e4fab68908 PARTNERSHIP WITH BUFFETT Explore avenues for partnership with GoR Stocktake MINECOFIN 06-02-2023 The Buffett Foundation funds several programs through RBC, Imbuto, Chai, and KFH. It’s also working with Delivery Associate in capacity building. N/A On-track 22-01-2025 09:38 PM 22-04-2025 01:58 PM
25f41716-5178-473d-a700-b4b6ec44084c NDUBA LANDFILL Waste management transformation: energy or fertilizers. Financing -Other financing options, can we optimize the use of Ireme climate funds? Mininfra and MoE to follow up. Post-cabinet MININFRA 01-07-2024 A study has been commissioned to determine the best use of the waste, and financing for the project is still being negotiated. N/A On-track 22-01-2025 09:38 PM 22-04-2025 01:59 PM
2782285d-3477-45ac-83d8-cd9c783511b5 KIGALI INFRASTRUCTURE 2025 PROJECTS Establish SPV company between NPD and Real Contractor to mobilize funds Stocktake MININFRA 05-02-2024 Crystal Ventures Limited secured Frw 88 billion from local banks, and work resumed in June 2024. N\\A Delayed 22-01-2025 09:37 PM 22-04-2025 03:53 PM
29617a80-42c4-4788-8f84-26b753d06444 PUBLIC TRANSPORT FARES Phase out subsidy on public transport tariffs by 1st March 2024 Stocktake MININFRA 05-02-2024 Public transport subsidies phased out. Flat fares replaced with cost-reflective, distance-based tariffs. Tap-in/tap-out system under testing for November 2024 implementation. N\A Delayed 22-01-2025 09:37 PM 22-04-2025 03:51 PM
2a25e5a8-65d5-4fc9-a675-8a2a3bd2429e CONSTRUCTION OF NYARUGENGE HOSTEL MINEDUC and MINECOFIN to ensure that the completed Nyarugenge hostel is acquired to accommodate UR students for this academic year Stocktake MINEDUC 02-09-2024 Nyarugenge Hostel currently accommodates 800 UR students but has not been acquired yet. UR and RHA are accelerating the acquisition and handover process, estimated to cost FRW 22.6Bn. N\A On-track 22-01-2025 09:37 PM 22-04-2025 03:55 PM
2cf61ae7-0661-46f4-8d59-d6a9d3b22c4b TAX REVIEW AND RESOURCE MOBILIZATION Transferring from central agencies to the national treasury Stocktake MINECOFIN 01-03-2023 Done on the 30th June 2023; Delays were caused by limitation of the law that says it can only be done end of FY N\A Completed 22-01-2025 09:38 PM 22-04-2025 03:56 PM
2e2822fb-3548-44d8-9249-1182eb2264ec UR REFORMS & SCHOOL DESK MANUFACTURING Develop a proposal to revamp UR Consultancy Firm Stocktake MINEDUC 01-04-2025 The process for hiring a consultancy firm to develop a comprehensive project proposal to revamp UR is not yet completed. N/A Delayed 22-01-2025 09:37 PM 22-04-2025 03:56 PM
2f7339b9-11b2-4ff0-a2cf-5de5dce1e00f MOBILE/TELECOM TOWERS Prior to the installation of towers, Telecom service providers must comply with radiation limits - IHS Rwanda Ltd. and TRES Infrastructure Ltd. Post-cabinet MINICT 01-04-2023 EMF radiation measurements conducted by RURA in 2023 and 2024 indicate that exposure levels from telecommunication antennas are significantly below international safety limits. N\A Delayed 22-01-2025 09:38 PM 22-04-2025 03:57 PM
2f9362e0-4bf0-43a8-97d3-685d494c4836 ONE STOP CENTER AT RDB Eliminate bureaucratic processes and fix inefficiencies Post-cabinet RDB 01-02-2024 RDB has partnered with Irembo to digitize, integrate, & improve business processes. Pilot phase for agribusiness, real estate, and mining launches in Q1 2025. Full platform integration by end of 2025 N\A On-track 22-01-2025 09:38 PM 22-04-2025 03:57 PM
31b7de8e-c6a9-4126-a8de-04dad6135f16 ELECTRICITY TARIFFS Hiring consultants for price revision Stocktake REG 03-07-2023 Consultant was hired by MINECOFIN- Rothschild N\A Completed 22-01-2025 09:38 PM 22-04-2025 02:40 PM
33db9e62-6c4a-4d34-a113-54d5ea4baba1 RWANDAIR CARGO Packaging material for perishable exports Stocktake MINAGRI 06-03-2023 With NAEB support, the packaging is now aligned with industrial best practice N/A Completed 22-01-2025 09:37 PM 22-04-2025 02:40 PM
33e27ca7-f215-4d84-958d-2f3238b30058 ELECTRICITY TARIFFS Proposal of how to buy Shema Power Stocktake MININFRA 06-05-2024 The Shema Power plant is estimated to be worth 340 million USD. The investor, Lord Laidlaw Irvine, will be visiting Rwanda in December. GoR may have an opportunity to discuss the buyout. N/A Delayed 22-01-2025 09:37 PM 22-04-2025 02:41 PM
346be5e7-cc38-4ff2-a29a-e4a473b573f4 CELL RESTRUCTURING Empower the cell to deliver more and uninterrupted services to the citizens. Stocktake MINALOC 06-05-2024 The new proposed structure some services offered at district will be decentralized to the sector and cell level. The # of staff at cell level will increase from 2 to 4 and their salary will increase. N/A On-track 22-01-2025 09:37 PM 22-04-2025 02:43 PM
384f81a6-4fa4-4d45-beca-ba75d980cd28 AGRICULTURE PRODUCTIVITY Boost agricultural productivity by expanding cultivated areas, preventing fertilizer, seed smuggling, and converting pastoral land in the Eastern Province to agricultural use Post-cabinet MINAGRI 01-01-2015 Fobasi mapping complete, site validation Feb 2025, PSTA5 targets 94.6kg/Ha fertilizer use, New blended fertilizers researched, MOPA system upgraded. Subsidy program reforms planned. N\A Delayed 22-01-2025 09:38 PM 22-04-2025 02:16 PM
3925578d-0004-4f04-9ee0-ef7c377b99d1 RWANDAIR CARGO Expansion of the cold room at the airport Stocktake MININFRA 04-03-2024 It was agreed to equip the NAEB facility with a security scanner to avoid overloading at the airport cold room. The security scanner is being installed at NAEB facility but not yet commissioned. N/A Completed 22-01-2025 09:37 PM 22-04-2025 02:17 PM
39c32e3a-0e20-4050-9765-19ede7ecb4bd QUALITY OF EDUCATION Training teachers using 6 modules Stocktake MINEDUC 03-07-2023 6 modules have been developed, and 9,445 teachers have been trained N/A Completed 22-01-2025 09:38 PM 22-04-2025 02:17 PM
3a6499c9-8b12-4974-b4a7-528275821c48 SMART CITIES Tree planting on the main road Stocktake MINALOC 04-09-2023 Mobilization and implementation ongoing N/A On-track 22-01-2025 09:37 PM 22-04-2025 02:18 PM
3ba3170e-dba5-4110-92e9-7d19c0025533 TELECOM INFRASTRUCTURE Plan to dissolve Maraphone Stocktake MINECOFIN 03-07-2023 Agaciro and MINECOFIN are liquidating Mara assets worth Frw 16 billion to attract investors, while negotiating with BK to transfer a Frw 30 billion loan for asset-liability purposes. N\A Delayed 22-01-2025 09:38 PM 22-04-2025 02:19 PM
3c5414fe-e3ce-4cd6-986a-68cbe295644d GAHANGA HOUSING PROJECT Complete five blocks of 528 units for occupancy Stocktake MININFRA 06-05-2024 Overall progress is at 65.3 % with the construction of housing at 74 % (contract extended to 02nd March 2025) and external works at 25 % (contract extended to 15th June 2025). N/A Delayed 22-01-2025 09:37 PM 22-04-2025 02:19 PM
3d9c4e38-423a-4637-b402-5cbdff079882 FAST TRACK PRIVATIZATION Participation by public into economy by fast-tracking privatization of companies that have been identified as priority for the Government to sell shares to the public. Post-cabinet MINECOFIN 01-01-2025 21 companies have been identified for privatization: 10 have been privatized, and 9 have been transferred to the Agaciro Fund. MINECOFIN and RDB are closely monitoring the remaining two. N/A Delayed 22-01-2025 09:38 PM 22-04-2025 03:58 PM
3f6616ed-cf4e-4426-8820-953c48732229 QUALITY OF EDUCATION Using fortified whole grain in schools Stocktake MINEDUC 05-06-2023 No action. MINEDUC has been reminded to re-visit this file N/A Delayed 22-01-2025 09:38 PM 22-04-2025 02:21 PM
3fd9d4a8-9a5e-46ed-9900-c993fab8e5ea BWIZA RIVERSIDE HOMES Assess and resolve issues identified in the implementation of Project Phase 1 and decide on the way forward regarding Phase 2. Post-cabinet MININFRA 01-01-2025 Sales are slow due to affordability issues; it is recommended to open to general public, but the SC is yet to make a final decision on this. discussions are ongoing for alternative funding models N\A Delayed 22-01-2025 09:38 PM 22-04-2025 02:22 PM
4143bf51-75d8-434b-81ea-711644587ec9 FOOD SECURITY &INFLATION Upgrade silos in poor conditions for grain storage. Stocktake MINICOM 01-01-2025 New 10,000 MT silo under construction in Kigali Economic Zone. Nyagatare silos upgraded & expanded to 20,000 MT. Nyanza warehouse expanded to 4,500 MT with security enhancements. N/A On-track 22-01-2025 09:37 PM 22-04-2025 03:58 PM
4223c479-c3da-43bb-9383-3a50ec72fe1d PROJECT IMPLEMENTATION AUDIT Conduct an audit on projects’ implementation status as well budget execution rates. Institutions lagging behind should be held accountable Post-cabinet MINECOFIN 01-01-2025 Audits and monitoring are continuous. There are 931 GoR projects with a budget of Frw 1,296.8 BN, which are closely monitored and executed at over 90% of the allocated development budget in FY 2021/22 N/A Delayed 22-01-2025 09:38 PM 22-04-2025 03:59 PM
4352e497-44d5-4d92-8063-d53ae4936edc AIR QUALITY Inform the public about new measures to improve air quality Stocktake MININFRA 01-10-2024 Media conference was held on 1st December 2024 to explain to the public the new measures to improve air quality N\A On-track 22-01-2025 09:37 PM 22-04-2025 02:24 PM
44cf1b68-dc88-47f8-a46b-e4bad6f225f0 UPDATE ON MARBURG OGS to release a travel advisory on how serious GoR is handling the outbreak, and RDB to also release guidelines for tour operators and the business community in general Stocktake MoH 02-09-2024 The outbreak was declared over on December 20, 2024, after 42 days without a new case N\A Completed 22-01-2025 09:37 PM 22-04-2025 02:24 PM
457f809c-6b39-4b22-aa51-e575d3d9c171 KIGALI PELE STADIUM Ownership and Management of the stadium by MINISPORTS Post-cabinet MINISPORTS 01-01-2025 The transfer of management between CoK and MINISPORTS has been done, CoK handed over all files pertainig to this process N\A On-track 22-01-2025 09:38 PM 22-04-2025 02:25 PM
458bdb46-5f48-4d42-992b-b1b67e038a59 Dashboard Menu for cabinet member. Develop a separate menu on dashboard for cabinet members to track cabinet actions. GACU-Meeting Axel, Oscar, Ornella 23-04-2025 2025-06-01 On 24 April 2025, the team met RISA representative to discuss the next steps. Engage development team from RISA. On-track 24-04-2025 06:58 PM 24-04-2025 06:58 PM
45ea5512-d9c5-47ba-86db-29c522e4bb39 ELECTRICITY TARIFF MINECOFIN to give REG FRW 20 billion for outstanding invoices Stocktake MINECOFIN 01-05-2024 REG has received FRW 20B thus far for the last financial year, 2023/2024 N\A Completed 22-01-2025 09:37 PM 22-04-2025 02:25 PM
47cadf29-d780-4996-9d66-a0daad506369 EURO 4 FUEL Euro 4 fuel stations conveniently placed for high-end consumption Stocktake MININFRA 04-12-2023 7 petrol stations with Euro 4 fuel. Engine: 3 located in Kanogo, Kicikuro by MOH HQ and Kimironko SP: 4 located in Town by Ubumwe Hotel, Sopetrade, Kanogo-Rugunga and Rwandex N\A On-track 22-01-2025 09:37 PM 22-04-2025 02:26 PM
4bd531b0-2adf-4f99-885c-3a101e19f84b PRIORITIZING GRADUATES WITH DIPLOMAS FOR B-TECH MINEDUC, RP, and HEC to ensure that previous graduates with advanced diplomas are prioritized for B-Tech in case they are qualified Stocktake MINEDUC 01-01-2025 N\A Completed 22-01-2025 09:37 PM 22-04-2025 04:00 PM
4d39932c-5ba5-4527-b2ad-e8b0b42d5ef7 RWANDAIR CARGO Recruiting cargo-agents Stocktake RWANDAIR 01-01-2025 N\A On-track 22-01-2025 09:37 PM 22-04-2025 02:43 PM
4e224576-1efd-469e-9c8b-c0e283901a49 OPTIMIZING VALUE FROM MINING Explore possibilities of government or attract foreign investments Post-cabinet RMB 01-01-2025 Ongoing exploration will attract investment in the mining sector, and partnerships between foreign and local entities are being facilitated. N\A Delayed 22-01-2025 09:38 PM 22-04-2025 04:01 PM
4e8cf826-44a5-4ee4-8346-cc695d7af179 REGULAATION AND LICENSING OF GAMBLING ACTIVITIES For RDB, reorganized gambling by reviewing requirements to obtain a license and assessment of existing licensed companies. RDB, Minicom to expedite the transfer. Post-cabinet RDB 01-01-2025 RDB now oversees gambling, efforts to establish a department and securing budget are ongoing. RDB and PSF consult with licensees, while a legal review of the new gambling law proceeds. N\A Delayed 22-01-2025 09:38 PM 22-04-2025 04:02 PM
4f84ac90-4117-40cd-bb4e-0c948f9247e4 JOINT VENTURE WITH QATAR Conclude the agreement with Qatar Stocktake RDB 01-01-2025 N\A On-track 22-01-2025 09:37 PM 22-04-2025 02:45 PM
50d41581-90a2-45ba-bbf5-ab9c9205aa0c AIR QUALITY Improve air quality. Further, on electric moto - Government must encourage purchase of electric moto and in parallel, ensure the market is ready to provide them(cleaner, cost-effective). Post-cabinet MININFRA 01-01-2025 RIEP Ltd. signed a concession for vehicle inspection software, pilot testing begins May 2025 (motorcycles first). Equipment arrives April, tests at RNP centers. E-Mobility focuses on charging stations N\A On-track 22-01-2025 09:38 PM 22-04-2025 02:34 PM
5759ad9a-21c5-4bf3-bcb1-db0b6610fbec REVIEW OF POWER PURCHASE AGREEMENTS Sustainability and viability review of all independent power generation projects and re-negotiate tariffs. Minecofin, Mininfra to lead this process. Post-cabinet MININFRA 01-01-2025 A collaborative MoU, crafted by MININFRA, RDB, and REG, addresses key energy sector needs. It focuses on expanding installed capacity, restructuring project finances, and amending the existing project N\A On-track 22-01-2025 09:38 PM 22-04-2025 04:04 PM
57630dee-7a04-4dfc-a873-736dba0684b9 DISASTER MANAGEMENT Resettling households after construction Stocktake MINECOFIN 01-01-2025 MINECOFIN's 1.5B FRW delay halts resettlement, forcing continued high rents. World Bank needs proof resources for expropriation, before MINEMA utilizes the 17M euros available. N\A On-track 22-01-2025 09:38 PM 22-04-2025 02:44 PM
5d38999a-a815-40e1-8364-4e2926f96d35 JOINT VENTURE WITH QATAR Proposal for four RwandAir board members Stocktake Axel 01-01-2025 N\A Delayed 22-01-2025 09:37 PM 22-04-2025 02:35 PM
5d499900-749f-4817-9f6e-d0008c819c56 RWANDAIR CARGO Developing a competitive pricing model to attract importer Stocktake Axel 01-01-2025 N\A Completed 22-01-2025 09:37 PM 22-04-2025 02:36 PM
5f97e173-de52-4c8e-abc1-e90660bca6c3 URUKUMBUZI ESTATE Inspections of all houses in Urukumbuzi and similar housing projects Stocktake Axel 01-01-2025 N\A Completed 22-01-2025 09:38 PM 22-04-2025 02:36 PM
5f9c3bfa-0b6a-4dd9-8d2a-fa76f4f592ef AIR QUALITY Report back on the Rwanda’s poor ranking of polluted cities Post-cabinet MININFRA 01-01-2025 The counter-report was done and shared with OTP for review, and to OGS for dissermination N\A Completed 22-01-2025 09:38 PM 22-04-2025 02:37 PM
603ee504-d15d-432f-8783-d11acab541f9 UPDATE ON MARBURG Moving the isolation center from Nyamata to Baho International Hospital. Stocktake MoH 01-01-2025 N\A Completed 22-01-2025 09:37 PM 22-04-2025 02:42 PM
6051dfd2-e797-4383-a74d-4c5ad2230034 REVAMPING THE PENSION SCH Study to explore different pension schemes Stocktake RSSB 01-01-2025 N\A On-track 22-01-2025 09:37 PM 22-04-2025 03:02 PM
62f865f0-de6d-4cd4-ab2a-b863f14fde53 AMAHORO STADIUM identify issues related to equipment internal room setup and management Stocktake MINISPORT 01-01-2025 N\A Completed 22-01-2025 09:37 PM 22-04-2025 02:39 PM
65800680-9177-4788-a9c4-3e7b6ea3b30b TELECOM INFRASTRUCTURE Removing monopoly in infrastructure development Stocktake MININFRA 01-01-2025 N\A On-track 22-01-2025 09:38 PM 22-04-2025 02:46 PM
66b5816c-18b1-47a7-859a-7fc02f6c79bc NYANDUNGU ECO PARK EXPANS Expansion of Nyandugu Eco-Park Post-cabinet MOE 01-01-2025 Expanded (43Ha), but landowner compensation (9B FRW) is delayed. Only 6/73 paid. CoK's proposed in-kind compensation is stalled; CoK seeks MoE meeting to discuss this in-kind alternative. N\A On-track 22-01-2025 09:38 PM 22-04-2025 02:46 PM
6e266fe1-effb-4364-85b1-177f47356a63 TAX REVIEW AND RESOURCE MOBIILIZATION Aggressive mobilization of resources from DP Stocktake MINIFRA 01-01-2025 N\A On-track 22-01-2025 09:38 PM 22-04-2025 04:05 PM
6e9d93d4-8960-43dc-9d67-0aa6dd24c43c FUEL STORAGE Increasing fuel storage capacity Stocktake MININFRA 01-01-2025 N\A Completed 22-01-2025 09:37 PM 22-04-2025 02:48 PM
71b00251-c201-4889-b0f2-5a651256c246 PROJECTS EXECUTION To fast-track execution of Government projects, by adjusting projects that require modification and accelerate implementation of those that have stalled Post-cabinet MINECOFIN 01-01-2025 MINECOFIN is finalizing construction contracts, reviewing expropriation funds and tax waivers for infrastructure projects, and developing an IFMIS-based dashboard. N\A Needs Urgent Action 22-01-2025 09:38 PM 22-04-2025 02:48 PM
72f9f309-282e-4f55-a475-ed14a14d17b9 UR REFORMS & SCHOOL DESK MANUFACTURING Manufacture and repair over 445,772 school desks Stocktake MINEDUC 01-01-2025 N\A Needs Urgent Action 22-01-2025 09:37 PM 22-04-2025 04:05 PM
740bcaf6-d288-442f-b945-ab97ff0d61a5 SMART CITIES Re-integrating and settling street children Stocktake MININFRA 01-01-2025 N\A On-track 22-01-2025 09:37 PM 22-04-2025 02:49 PM
74eb2e13-b093-4092-b175-c089fda27d99 UPDATE ON AGRICULTURE SEASON 2025A The Progress of Agricultural Season 2025A. Stocktake MINAGRI 01-01-2025 N\A On-track 22-01-2025 09:37 PM 22-04-2025 04:06 PM
789fb4ca-747f-4594-92fc-0fdc419f2f86 CHURCHES Accelerate the ongoing campaign to ensure Faith-Based Organizations comply with regulations Stocktake MINALOC 01-01-2025 N\A On-track 22-01-2025 09:37 PM 22-04-2025 04:07 PM
78c23506-d7a8-4b75-8dbc-fa2f5ed11dcf TAX REVIEW Harmonization of fees in a single value chain Stocktake MINECOFIN 01-01-2025 N\A Completed 22-01-2025 09:38 PM 22-04-2025 02:52 PM
7a73c5db-ef45-45ce-9d80-27c3d8b4207a KIGALI GREEN COMPLEX(KGC) Assess different scenarios to look for investors/partners actively. Post-cabinet MINECOFIN 01-01-2025 The project has been put on hold due to financial constraints. N\A Not Started 22-01-2025 09:38 PM 22-04-2025 02:52 PM
7ace01b4-a255-4cb4-847c-b6e55a344cd8 LIVESTOCK VACCINATION Streamline livestock vaccination process, eliminate all obstacles including those related to legislation Post-cabinet MINAGRI 01-01-2025 Free national livestock vaccination program exists, following a disease-based calendar. East Coast Fever vaccine is subsidized. Awareness raised via RAB, Zipline, and private vets N\A On-track 22-01-2025 09:38 PM 22-04-2025 02:53 PM
7dabf376-7113-4e04-b962-38253accce53 PILGRIMAGE REGULATION Monitor and educate citizens and faith-based followers on unauthorized prayer practices, engage religious leaders, and suspend harmful or policy-contradicting activities Post-cabinet MINALOC 01-01-2025 Nationwide, 115 prayer caves and 9,171 substandard prayer houses were closed. RGB released new FBO regulations (March 7, 2025) and is conducting public awareness campaigns via TV/radio. N\A On-track 22-01-2025 09:38 PM 22-04-2025 02:53 PM
7dc6db1e-7d8d-4d14-befd-a385a11c741f RUSIZI III PROJECT Renegotiating the contract or exit Stocktake MININFRA 01-01-2025 N\A On-track 22-01-2025 09:37 PM 22-04-2025 02:54 PM
816e13cd-b2ac-424b-b2f8-5d12970806d6 RWANDAIR Securing capital requirements for a Joint Venture transaction with the Qatar Investment Authority (QIA) Stocktake RWANDAIR 01-04-2025 N\A On-track 22-01-2025 09:37 PM 22-04-2025 02:55 PM
835490c5-fc98-4866-a637-9366899420d3 QUALITY OF EDUCATION Water, electricity, and food to be procured on the district level Stocktake MINEDUC 01-01-2025 N\A Completed 22-01-2025 09:38 PM 22-04-2025 02:55 PM
86539183-74bb-477f-ba6e-286a69b8c000 HEALTH SERVICES LAW Measures on reproductive health services to adolescents. This applies to other decisions made in Cabinet. Minisante to lead on communicating the law on health services. Post-cabinet MINISANTE 01-01-2025 The law is currently in Parliament for review N\A On-track 22-01-2025 09:38 PM 22-04-2025 02:56 PM
898c9a6a-1db8-479f-adb0-44320cdfbbaa E-PAYMENT SYSTEM Improve the efficiency and quality of the electronic payment system Post-cabinet MINICT 01-01-2025 R-SWITCH launched eKash in 2022; expanded to 4.71M users by Dec 2023. New infrastructure developed, disaster recovery center, new server sites, power backup. N\A Completed 22-01-2025 09:38 PM 22-04-2025 02:56 PM
8b5b335b-ca33-44f1-bc82-dd7a054dfb8a HELMET PROJECT Fast-track the operationalization of the standards helmet project and helmet testing laboratory. Post-cabinet MININFRA 01-01-2025 A plan for sensitization campaign was prepared and relevant institutions have been engaged to ensure smooth transition. N\A On-track 22-01-2025 09:38 PM 22-04-2025 02:57 PM
8c30bd84-89ca-4087-b816-20432c3c69ec FACILITATING FEMALE TEACHERS TO DECLARE PREGNANCIE MINEDUC and MINALOC to implement a mechanism for female teachers to declare pregnancies in advance for timely replacement in their absence. Stocktake MINEDUC 01-01-2025 N\A On-track 22-01-2025 09:37 PM 22-04-2025 02:57 PM
8e0f16ca-71ef-4ed6-b8cc-9474be51b971 GAHANGA HOUSING PROJECT Re-innovation of Nobilis Hotel and one-dollar campaign building Stocktake MININFRA 01-01-2025 N\A On-track 22-01-2025 09:37 PM 22-04-2025 02:58 PM
8e997959-36be-472a-9cd0-36ad3cc92a3e GAKO PROJECT Government to send a team to Qatar to negotiate with BALADNA company on investment options. Stocktake RDB 01-01-2025 The file is closed with the initial investor, initial discussions are ongoing with other investors N\A Needs Urgent Action 22-01-2025 09:37 PM 22-04-2025 02:59 PM
90942f25-2922-4dc2-86a1-c3354882109e TEXT BOOKS MINEDUC to develop a project proposal to secure funding from partners aimed at producing the necessary textbooks to achieve a 1:1 student-textbook ratio across all education levels Stocktake MINEDUC 01-01-2025 N\A On-track 22-01-2025 09:37 PM 22-04-2025 02:59 PM
95eff147-aec7-4fb4-b884-f88fcf7ae38b MINING SECTOR Fast-track revamping of the mining sector Post-cabinet RMB 01-01-2025 Local equipment/explosives via REMCO and security agencies, electricity tariff negotiation, grid connection progress, and financial institution engagement for funding. N\A Delayed 22-01-2025 09:38 PM 22-04-2025 03:00 PM
97186f8d-10e9-4416-9a77-f9594e70e24e NOISE POLLUTION 1)Revisiting measurement for sound intensity. 2) Noise pollution instructions. 3) Set guidelines to businesses exempted from closing. Stocktake MOE 01-01-2025 N\A On-track 22-01-2025 09:37 PM 22-04-2025 03:01 PM
9a9b0ae1-4328-4542-b8ee-7dabe196a6ad TELECOM INFRASTRUCTURE Plan for needed towers and small gap fillers Stocktake MININFRA 01-01-2025 N\A On-track 22-01-2025 09:38 PM 22-04-2025 03:01 PM
9aec489e-3ec1-4008-bc28-a56372450cff NYABARONGO II Assessment of whether the design of the Nyabarongo II Multipurpose dam might have a flooding danger, especially on infrastructures (schools, HCs, roads, etc.) Post-cabinet MININFRA 01-01-2025 Project implementation progress is at 42%. It expanded its capacity and secured necessary flood capacity without added costs, but faces financial hurdles with outstanding expropriation fees of 83Bn N\A On-track 22-01-2025 09:38 PM 22-04-2025 04:08 PM
9bf79488-a94d-464d-a8fb-7ff59be0e051 ELECTRICITY TARIFF Re-negotiating with 17 small power plants to cut the prices Stocktake MININFRA 01-01-2025 N\A Delayed 22-01-2025 09:37 PM 22-04-2025 03:03 PM
9e6b78f8-00eb-47b6-8d1e-c65415ae1f1b SMART CITIES Inspecting churches, bars, and wedding tents Stocktake MINIFRA 01-01-2025 N\A On-track 22-01-2025 09:37 PM 22-04-2025 03:03 PM
9f454a23-6b26-41ca-a0db-e5b058270ed5 DISASTER MANAGEMENT Resettling households after construction Stocktake MOE 01-01-2025 N\A On-track 22-01-2025 09:37 PM 22-04-2025 03:04 PM
a5b37f16-cd5d-4413-b4fa-ba80f8328bf6 UR REFORMS & SCHOOL DESK MANUFACTURING Health Insurance Provisions in UR Law Stocktake MINEDUC 01-01-2025 N\A Completed 22-01-2025 09:37 PM 22-04-2025 03:04 PM
a6637c3a-6e05-443a-bd2c-042fb54c258d EAX Revamp and Commercialize EAX Post-cabinet MINECOFIN 18-10-2024 2024-12-02 The Valuation of assets to be transferred was completed, 27,693,473,387 frw for purchasing commodities has been requested, appointment of Board is pending. Follow-up on requested funds, assets transfer & board leadership Delayed 12-02-2025 11:13 AM 22-04-2025 03:05 PM
a85ed482-24de-4282-97ef-001f6b761b88 TAX POLICY ON SCHOOLS Review tax policy on school construction/other related materials to consider including wooden school products for exemption Post-cabinet MINEDUC 01-01-2025 MINEDUC is collaborating with the Wood Value Chain Association, leveraging their tax expertise to establish a well-structured tax exemption framework for wooden and related materials for schools. N\A Needs Urgent Action 22-01-2025 09:38 PM 22-04-2025 03:06 PM
abd81f90-0dbd-4d3f-b4e4-d4aa46b7fd7f FOOD SECURITY & INFLATION Establishing the national aggregator company and transfer it to AGDF Stocktake MINAGRI 01-01-2025 N\A Completed 22-01-2025 09:37 PM 22-04-2025 03:07 PM
abe3d8e9-0d50-41c6-82ac-24674f940105 VETERINARY SERVICES Regulate and monitor private veterinary services Post-cabinet MINAGRI 01-01-2025 MINAGRI has implemented a PPP model for veterinary services, transferring some responsibilities to private veterinarians, who MINAGRI and the Rwanda Council of Veterinary Doctors regulate. N\A Completed 22-01-2025 09:38 PM 22-04-2025 03:07 PM
adb88e94-fd1c-4ac6-82c0-29f752936ec9 PUBLIC PROCUREMENT PROCESSES Improve public procurement process from the planning stage to the contract execution Post-cabinet MINECOFIN 01-01-2025 A ministerial order establishing public procurement regulations was published and is expected to improve the procurement processes. N\A Delayed 22-01-2025 09:38 PM 22-04-2025 03:08 PM
ae490496-bfe6-46a6-8beb-6d52bd52d6e6 UPDATE ON MARBURG Communicating clear guidelines on MVD measures Stocktake MOH 01-01-2025 N\A Completed 22-01-2025 09:37 PM 22-04-2025 03:09 PM
af2cc9a8-80f3-41e5-96af-eb900a073868 TAX REVIEW Manage the public misuse of TIN numbers Stocktake MINECOFIN 01-01-2025 N\A Completed 22-01-2025 09:38 PM 22-04-2025 03:09 PM
aff9a3e6-270d-491d-8a5d-d9802a25f448 MINING SECTOR ISSUES These issues include high RMB staff turnover, financing difficulties, artisanal mining dominance, illegal mining, limited exploration data, and raw mineral exports. Post-cabinet RMB 01-01-2025 A new mining law has been enacted to improve compliance, and a new royalty law has been introduced to incentivize local mineral processing. N\A Delayed 22-01-2025 09:38 PM 22-04-2025 03:10 PM
affacb6c-9fce-4e89-85aa-b47436f66a14 ECONOMIC BRIEFING Identification of projects to be written-off Stocktake MINECOFIN 01-01-2025 N\A On-track 22-01-2025 09:37 PM 22-04-2025 03:11 PM
b1fb8dec-cae3-4f66-84fa-ab18e1757854 FOOD SECURITY Identifying strategic investments required to ensure sustained food security Post-cabinet MINAGRI 01-01-2025 Key strategic investments for agriculture include expanding irrigation, maintaining current systems, constructing more silos, and enhancing productivity through innovative funding approaches. N\A Delayed 22-01-2025 09:38 PM 22-04-2025 03:12 PM
b20c587d-2cb6-45d8-87a0-4e0f8bbad41c DIPLOMATIC LAND TO SAUDI ARABIA Rwanda to provide land to Saudi Arabia as agreed Post-cabinet MINAFFET 01-01-2025 Rwanda has shared the land details (at diplomatic village) and its map with Saudi Arabia. Saudi Officials are expected for sight inspection, but have not yet communicated the date N\A On-track 22-01-2025 09:38 PM 22-04-2025 03:12 PM
b30ef97c-5b67-4aeb-a519-346797c195d3 SPORTS SECTOR Addressing issues that arise in the sports sector Post-cabinet MINISPORTS 01-01-2025 MINISPORTS is working with federations to prioritize governance and establish clear goals while collaborating with RGB to improve registration processes and statutes for federations and clubs. N\A On-track 22-01-2025 09:38 PM 22-04-2025 03:13 PM
b46eb7cb-2ff9-4e70-a3e5-30a4e5b05806 PUBLIC TRANSPORT Additional bus purchase (expected 305 buses) Stocktake MININFRA 01-01-2025 N\A On-track 22-01-2025 09:37 PM 22-04-2025 03:14 PM
b71ae580-8df1-43bc-b170-7dfdad073be8 REVISED STRATEGIC GUIDE FOR HOUSING DEVELOPMENT A comprehensive guide Stocktake MININFRA 01-01-2025 N\A Delayed 22-01-2025 09:37 PM 22-04-2025 03:15 PM
b86167df-eba1-4caf-ab4b-36899b3a5312 4TH JULY PROJECT Construction to be completed in Mpazi Stocktake RHA 02-01-2024 N\A Delayed 22-01-2025 09:37 PM 22-04-2025 03:16 PM
b8ca0dd9-c43c-486e-98b5-9df04ee9561e AMAHORO STADIUM Prepare for FIFA inspection taking place between June 1st-10th 2024. Stocktake MINISPORTS 01-01-2025 N\A Completed 22-01-2025 09:37 PM 22-04-2025 03:16 PM
b9c6a25b-3009-46dd-a081-0499ba5c4df1 CoK ROADS & CITY HYGIENE Clear Plan to upgrade key roads in Kigali (CoK & MININFRA) Post-cabinet MININFRA 01-01-2025 Road projects (Prince House, Nyabugogo) designs fast-tracked. 120km priority road list prepared. MINECOFIN funding sought via China-Exim Bank. N\A On-track 22-01-2025 09:38 PM 22-04-2025 03:17 PM
bc6fecdf-7f32-4bd5-a67c-8d36391262b5 G+3 school project in Musanze MINEDUC, MINECOFIN, and MINALOC to fast track the construction of the ongoing G+3 school project in Musanze. Stocktake MINEDUC 01-04-2025 N\A On-track 22-01-2025 09:37 PM 22-04-2025 03:40 PM
bcc23350-25ca-49a2-b4c7-7dbce579233e RWANDAIR The Rwandair leased aircraft for agricultural produce needs to be utilized as a matter of priority. Post-cabinet MININFRA 01-01-2025 RwandAir cargo aircraft is currently operating at full capacity for outbound flights and the following new routes are operationalized: Dubai, Sharjah, Djibouti, Nairobi, Entebbe and Brazzaville. N\A Completed 22-01-2025 09:38 PM 22-04-2025 03:18 PM
bd8eecca-bdf1-4fbf-ace2-2a5be8a9fc4c POST-HARVEST HANDLING FOR SEASON 2024A Enforce quality control measures for maize imports: no new import licenses issued, maize and maize flour imports banned Stocktake MINAGRI 01-01-2025 N\A On-track 22-01-2025 09:37 PM 22-04-2025 03:18 PM
bea6a0f4-da5f-4a79-8e80-14ff3ee28b2a CLEAN WATER & INDUSTRIAL KITCHENS Ensure schools have clean water and adequate storage through rainwater harvesting, boreholes, and other methods to support the school feeding program Post-cabinet MINEDUC 01-01-2025 Pilot launched by Solid Africa at GS Kagugu and Ruhanga in Kigali. Under the Project (World Bank), 4,4,719 tanks (96.3%) out of 4,899 planned have been supplied to schools. N\A On-track 22-01-2025 09:38 PM 22-04-2025 03:19 PM
c1bc1e73-9ec9-4844-9be5-08c1a9628188 NDUBA LANDFILLED Conclude the negotiations with 3 companies and select one to carry the project Stocktake MININFRA 01-01-2025 N\A Completed 22-01-2025 09:37 PM 22-04-2025 03:20 PM
c23f2d6a-3725-40be-8e45-b2ce2970dfa2 GIKONDO INDUSTRIAL PARK Update on the Gikondo Industrial Park. Post-cabinet MOE 01-01-2025 Construction drawings for four wetlands completed. Progress for 4 wetlands is 22.4% complete. Tree planting will be done in the rainy season (April 2025). N\A Needs Urgent Action 22-01-2025 09:38 PM 22-04-2025 03:20 PM
c347b4af-f519-4353-8db9-c3711c096dac TELECOM INFRASTRUCTURE Construction of big telecom towers Stocktake MININFRA 01-01-2025 N\A On-track 22-01-2025 09:38 PM 22-04-2025 03:20 PM
c4cd4398-a7cc-45da-af19-73252f6bf13a 4TH JULY PROJECT Relocating households to avail Mpazi construction site Stocktake MININFRA 01-01-2025 N\A On-track 22-01-2025 09:37 PM 22-04-2025 03:21 PM
ca2ef835-3020-4738-b96d-b16d7e51990a REVAMPING THE PENSION SCHEME Increase the rate of contribution from 6% to 12% by Jan 2025 Stocktake RSSB 01-01-2025 N\A On-track 22-01-2025 09:37 PM 22-04-2025 03:22 PM
cab2f881-55c8-4edd-8e9e-eae97e0c2e9a URUKUMBUZI ESTATE Establishing a team for assessment and monitoring Stocktake MININFRA 01-01-2025 N\A Completed 22-01-2025 09:38 PM 22-04-2025 03:23 PM
cc496df7-be0f-4c87-bcc5-4d6bd91ff797 PUBLIC TRANSPORT Ensure and encourage free entry for other providers Stocktake MININFRA 01-01-2025 N\A Completed 22-01-2025 09:37 PM 22-04-2025 03:28 PM
cc74eb30-49ae-4221-ba13-bd43676ec260 FISCAL GAP Restructuring of SPIU Stocktake MINECOFIN 01-01-2025 N\A Completed 22-01-2025 09:38 PM 22-04-2025 03:33 PM
cea89d83-c8ae-4b49-b40c-7cccbb7a2e68 TAX REFORM & FOOD INFLATION Translating VAT exemptions on food consumption into a reduction in prices Stocktake MINECOFIN 01-01-2025 N\A On-track 22-01-2025 09:37 PM 22-04-2025 03:34 PM
d1bdcfbd-3bf5-4f68-97df-41406c6ba6fc WOOD (1) Capitalize on existing forests, and the factory, and prioritize local wood production (2) Put in place concrete measures to support local wood processors. Post-cabinet MINICOM 01-01-2025 The government is supporting the wood value chain through tax incentives(28ICPCs), financing for technology acquisition (USD 300M). N\A On-track 22-01-2025 09:38 PM 22-04-2025 03:47 PM
d55ceecb-a4db-4869-a141-4baf9c239b28 JOINT VENTURE WITH QATAR Finalize RwandAir business plan Stocktake RDB 01-04-2025 N\A Delayed 22-01-2025 09:37 PM 22-04-2025 03:35 PM
dc982daf-2565-44f7-a2f5-ca01edec4a4d UR REFORMS & SCHOOL DESK MANUFACTURING Submit a phased proposal for classroom and hostel construction Stocktake MINEDUC 01-01-2025 N\A Delayed 22-01-2025 09:37 PM 22-04-2025 03:36 PM
e0d65771-0d64-486a-a69f-5c906b8c5f5b TAX REVIEW Develop a proposal on taxation of wines and spirits Stocktake MINECOFIN 01-01-2025 N\A Completed 22-01-2025 09:38 PM 22-04-2025 03:37 PM
e1108139-1ae4-4132-8d1d-71a8a94dd932 TAX REVIEW AND RESOURCE MOBILIZATION Monitoring tax incentives (tax havens, reliefs, etc) Stocktake MINECOFIN 01-01-2025 N\A On-track 22-01-2025 09:38 PM 22-04-2025 03:36 PM
e16dbcc5-3683-48a3-9611-89963a7579c7 ROAD TO GASHORA Work on the road heading towards the school and within the school premises, as well Post-cabinet MININFRA 01-01-2025 Completed N\A Completed 22-01-2025 09:38 PM 22-04-2025 03:38 PM
e1afdec4-be0a-464b-8fb0-2dba2ff42b0f UCI 2025 PROJECTS Expedite execution of critical UCI 2025 projects with a focus on roads Stocktake MINISPORTS 01-01-2025 N\A Needs Urgent Action 22-01-2025 09:37 PM 22-04-2025 03:38 PM
e1dbe5a1-0603-4ad8-bbcb-be0f23522d1b NDUBA LANDFILL Conclude Agreement with Mota-Engil & address Capacity Issue noted Post-cabinet MININFRA 01-01-2025 Agreement became effective in September 2024, detailed design is at draft level, site mobilization works ongoing N\A On-track 22-01-2025 09:38 PM 22-04-2025 03:39 PM
e416ca72-1871-4379-ad1e-f93516f84b60 ELECTRICITY COST Discontinue the use of electricity generated from Jabana thermal power station and work towards effecting the agreement with neighboring countries to use electricity from power plants Post-cabinet MININFRA 01-01-2025 Decommissioned 30MW diesel-fired stations at Mukungwa1, Masoro, Birembo; Jabana_2 retained for emergencies. N\A Completed 22-01-2025 09:38 PM 22-04-2025 03:40 PM
e5e3f1b9-d13e-4306-bcbd-9d30deb756d6 DELIQUENCY Conduct study on why young people from correctional centers return to the street Post-cabinet MINALOC 01-01-2025 The study was validated by the technical team, pending stakeholder validation N\A On-track 22-01-2025 09:38 PM 22-04-2025 03:42 PM
eb09fe7e-6273-4df5-a395-07a0d944b203 MINERALS INVENTORY MINING Mapping minerals/inventory: Beyond the 2017 airborne survey findings, have mineral resources stock and an exploration plan for the whole Country Post-cabinet RMB 01-01-2025 RMB's 3-year exploration program (2023-2026) targets key commodities to promote investment; the first year focuses on Lithium and Gold. N\A On-track 22-01-2025 09:38 PM 22-04-2025 03:47 PM
f1ced79f-0ea1-4151-83fc-6225c6456567 IMPROVE IRONDO PATROLS Select Irondo members by citizens during general assembly, Sectors oversee and supervise Irondo, manage at cell levels, and consider contributions from professional workers Post-cabinet MINALOC 01-01-2025 Guidelines are drafted, signed, and implemented. Districts and CoK are directed to closely monitor enforcement of these instructions. Implementation is actively tracked. N\A On-track 22-01-2025 09:38 PM 22-04-2025 03:46 PM
f5cd54d5-7247-4fd4-88ef-2d11ee7d811c KIGALI INNOVATION CITY RDB, Mininfra, and MINICT must work closely to follow up the construction process and facilitate the development and construction of the tech-hub in collaboration with Africa50. Post-cabinet RDB 01-01-2025 Designs 92% complete, construction 17%. KICCL began building with $10.4M from GoR/A50. $4.76M loan from BADEA is pending to complete project funding. N\A Delayed 22-01-2025 09:38 PM 22-04-2025 03:46 PM
f9d2ed2b-fa4e-4629-b0ad-0d9305d392a1 EAST AFRICAN COMMODITY EXCHANGE(EAX) Immediate for review are the Board and Management. This entity should operate commercially with minimal involvement from Government. Post-cabinet MINAGRI 01-01-2025 Board establishment is still pending, the company is now under Agaciro development fund. N\A Delayed 22-01-2025 09:38 PM 22-04-2025 03:45 PM
fc5bd479-ae7c-4866-b337-c875f2e06b38 TAX REVIEW Sensitize and enforce the use of EBM Stocktake MINECOFIN 01-01-2025 N\A Completed 22-01-2025 09:38 PM 22-04-2025 03:45 PM
fcdec48f-1199-4d57-9879-3acc135f45fc MEETING ON THE PURCHASE OF RICE BY EAX To assess the progress on the purchase of rice by EAX and its distribution to schools as part of the school feeding program. Stocktake MINICOM 01-01-2025 Through MINAGRI, EAX requested 27Bn, to purchase food produce including rice- 14,000 MT for 2025 seaon A, which are realesed weekly depending on purchase plan & distribution to schools is monitored. N\A On-track 22-01-2025 09:37 PM 22-04-2025 04:08 PM
fe3c5b79-7fe3-43f4-8610-3791f3a7ca84 INTERNET COSTS Urgently solve the issues of inconsistent internet connectivity and review the internet pricing model Post-cabinet MINICT 01-01-2025 The government is enhancing backhaul capacity to 20Gbps, aiming for a five-fold increase to improve internet connectivity for public institutions, regardless of potential price fluctuations N\A On-track 22-01-2025 09:38 PM 22-04-2025 03:43 PM
fe5a6ddc-b7dc-4f79-853f-fe5066e29844 ELECTRICITY TARIFFS FOR(non) or RESIDENTIAL - Revising existing power purchase agreements Stocktake MININFRA 01-01-2025 N\A Needs Urgent Action 22-01-2025 09:38 PM 22-04-2025 03:43 PM
ff2c03c0-bdd8-4027-aca9-9c382accb058 PRESERVING ENVIRONMENT IN MINING Current status of environmental degradation Post-cabinet MOE 01-01-2025 994 abandoned sites: 439 mines, 555 quarries; 916.1529 ha. N\A Delayed 22-01-2025 09:38 PM 22-04-2025 03:42 PM
141 items found, displaying all items.1